HA Oil Refinery Modernisation Project
Deputy Lead
Sr. Electrical / Instrumentation& Automation engineer

The Baku refinery’s modernisation project is scheduled for completion in 2018 following an investment of around $1.27 billion.

​

The overall refinery capacity will be increased from 6 to 7.5 million tons per year (MYPY).The catalytic cracking unit capacity will be increased from 2 to 2.5 MTPY, and Euro 5 standards will be established for all refined products. The modernization of the Heydar Aliyev Baku oil refinery will begin immediately and will be completed by late 2018, with an estimated capital cost of $1 billion USD for the total project.

​

Rahman assigned to the project as Client side Deputy Lead Engineer in the area of Electrical and Instrumentation & Process Automation System.

​

World Wide EPC Projects
Sr.  Instrumentation& Automation engineer

JGC Corporation was founded in 1928 as Japan’s first engineering contractor. Over its 80 years of operation as a “technological innovator without borders”, the company has been involved in well over 20,000 projects, in Japan and in over 70 countries around the world.

​
Rahman involved to the awarded EPC Projects  in JGC headquarter in Yokohoma , Japan
Oil and Gas Petrochemical Complex (OGPC) -Greenfield
Sr. Electrical / Instrumentation& Automation engineer

SOCAR started the implementation of the construction of the new Oil and Gas Processing and Petrochemical Complex (OGPC). Contracts have been signed with the world-renowned companies as "Technip", "Foster Wheeler", "UOP", "FLUOR", "KBR", "Societe Generale", "PricewaterhouseCoopers", "OMNI", "Clifford Chance" and AECOM

​

Rahman was  Responsible for FEED and EPC of the electrical and instrumentation facilities comprising new MV substations fed directly from Thermal Power Plant as well as local power authority national grid, MV Motor/VSD system and auxiliary switchroom / control room complex. Scope included interfacing with the local power authority to define and manage the power supply requirements and agreements.

Project |01

 

Project |01 CONSTRUCTION OF SIDE-UNDERPASSES OF BAGIROV BRIDGE



Employer : Azerbaijan Republic Ministry Of Transport Road

Location : BAKU / Azerbaijan
Completion Date : 4/6/2009

 

 



​

 

Project |02

 

Project |02 Bilgeh Estates Project

​

Bilgeh Estates Project is located on the Amburan shore of the Peninsula on an area of 800.000 sqm. There are a total of 80 exclusive villas almost on the shore of Caspian including infrastructures, sport facilities and landscaping, complete to be built by DIA HOLDING.
The Project is not only designed to be a breakaway from the busy urban life; but an alternative living style for the city dwellers of Baku.

Project |03

 

Project |03 Engineering-Robotics Mentor

​

In this project I have been assigned to be Robotics Mentor for Middle High School student to compete in State Wide Robotics Competitions... 

Under my mentorship Teams got 6 First place , 11 second places , 29 3rd places , and so on...

​